Different types of buildings are available for re-population and manufacturing footprint expansion on Technology Campus Tirol
B3: State-of-the-art chemical synthesis plant with a dedicated tank farm constructed in 2004. The facility is mothballed, and the equipment is operational.
B1: Clean room facility with 400 m2 class C area built up in 1995. HVACs is fully functional. Former manufacturing equipment was dismantled.
B2: Tank farm constructed in 1990. 51 tanks with a total storage volume of ~3000 m3 are available and can be re-utilized for different purposes.
B4: Former manufacturing building from 1989 with 3475 m2 area. Process equipment was dismantled, and process cooling machines are available.